As some of you may know our car took a turn for the worse last year at Bruntingthorpe Charity Day.
The previous year a 2.5 conversion was done, but a 2p hose from the FPR split which
caused major meltdown across all cylinders, which basically destroyed everything
Well the last 9 months have been strained, tha car has been in storage at CPAutos in Bristol, but at last the rebuild
can know begin, I've source a 2.2 cdb which will used to build a 2.35 stroker along with spec c heads or at worse
jdm heads with cosworth cams, RCM valves, springs, with a RCM rotated conversion with a garett gt35 turbo.........
plus a few other tricks along the way .
So hopefully this time it will be built properly and be ready for WRC Germany or I may have to hitch a lift